
BO Hotel
The project site located on the upper elevations of Beykoz was developed through the modular reduction of the existing hardscape and the reestablishment of soil and paving transition zones. Plant species selected through a twelve month seasonal colour analysis were introduced to the soil surfaces where the pavements were removed.
The project site located on the upper elevations of Beykoz was developed through the modular reduction of the existing hardscape and the reestablishment of soil and paving transition zones. Plant species selected through a twelve month seasonal colour analysis were introduced to the soil surfaces where the pavements were removed.


Type
Hotel
Location
Beykoz
Year
2023
Client
NUBA Group



The selection and placement of all plant species were determined based on climatic conditions water requirements and their flowering colours throughout the twelve month cycle.
The selection and placement of all plant species were determined based on climatic conditions water requirements and their flowering colours throughout the twelve month cycle.
planting that changes with the seasons
planting that changes with the seasons
planting that changes with the seasons


Explore other projects
We are landscape and urbanism studio.



We are landscape and
urbanism studio.



We are landscape and urbanism studio.





